navigation conditions造句
例句與造句
- Influence of peak regulation of tgp hydropower station during flood period on navigation conditions
三峽電站汛期調(diào)峰對通航影響的研究 - According to related standards , this paper puts forward the studying principle and method for navigation conditions of bridges
結(jié)合相關(guān)規(guī)范,提出了確定橋梁通航論證的方法。 - The navigation condition of shahong upper shallow region is improved , whereas channel maintenance of the lower shallow region becomes more difficult since the channel has been broadened
沙泓上淺區(qū)航道條件改善,但下淺區(qū)航道展寬左擺,發(fā)展下去不利于航道維護(hù)。 - Before the construction of bridge over navigable rivers , esp . on the reach of complicated topographical and flow conditions , factors such as bed evolution , bridge site ' s choice , clearance dimensions , navigation condition and safety - ensuring measures , etc . shall be studied
摘要在通航河流,尤其是在橋區(qū)地形、水流條件復(fù)雜河段處進(jìn)行橋梁建設(shè)前,必須對河床演變、橋位、凈空尺度、通航條件和安全保障等因素進(jìn)行論證。 - In contrast , the author believes that it is unreasonabie that the carrier have immunity from the fault of his crew under up - todate navigation condition . the author will justify his opinion by ; ( 1 ) discussing the history of liabiiity basis system and the evoiution of its civii iaw standardi the iiabiiity basis system experienced objective distribution stage to subjective stage , which indicates the negation of subjective f8ult
本文將從以下幾個方面進(jìn)行論述: (一)分析歸責(zé)原則的發(fā)展歷程、民法基本觀念(即民法的本位)的演進(jìn),從宏觀的法律原理方面抽象論證航海過失免責(zé)的非正當(dāng)性;歸責(zé)原則從客觀歸責(zé)到主觀歸責(zé)的發(fā)展,表明人類對主觀過錯的否定,雖然在意思自治原則下出現(xiàn)了一些過失免責(zé),但各國都對此給以了限制。 - It's difficult to find navigation conditions in a sentence. 用navigation conditions造句挺難的
- The system has a satisfactory variety of functions , strong adaptability , and is easy to use . another system is also developed for supervision and decision - making of ship navigation . the system can analyze navigation conditions , select and check navigation route based on data from physical and mathematical models
該系統(tǒng)應(yīng)用物理模型和數(shù)學(xué)模型的計算結(jié)果,結(jié)合形象、直觀的圖形顯示,能方便地對河道的航行條件進(jìn)行分析,并能進(jìn)行航線的選擇和檢驗;通過設(shè)定多個參數(shù)的大小,能進(jìn)行各種不同的航行演示,滿足實際的需要。 - Abstract : based on the results of hydraulic model test and remote - control ship model , the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed . the measures of raising navigation discharge level and improving navigation conditions are given
文摘:根據(jù)水工模型試驗成果,分析了三峽工程泄洪時壩下游引航道和兩壩間河段(三峽至葛洲壩)的非恒定波流運動特性,結(jié)合遙控自航船模試驗對兩壩間的通航水流條件進(jìn)行了分析評價,并提出了提高通航流量標(biāo)準(zhǔn)、改善通航條件的相應(yīng)措施。 - And , we also have had the relation between the size of the horizontal circulation regions and the fr number around the dike for the flow - deflection method . the results of this study show that , using the method of flow - deflection or " sucking - spouting " water , the flow pattern can be improved , the size of the horizontal circulation regions and the sedimentation volume caused by the horizontal circulation can both be reduced . so , they can be adopted to improve the navigation condition of upper approaching channel of three gorges project , which could guarantee the safety of navigation
通過試驗,得到了以下創(chuàng)新的成果: 1 、不加吸、噴水時,丁壩后的回流長度約為丁壩長度的8倍; 2 、加吸、噴水可以減小丁壩后的回流尺度和強度,并得出了有理論根據(jù)的吸、噴流量與回流尺度減小之間的定量關(guān)系以及吸、噴流量與丁壩周圍流速梯度之間的定量關(guān)系; 3 、加吸、噴水可以減小回流淤積,并得出了吸、噴流量與淤積量減小之間的定量關(guān)系以及回流尺度減小與淤積量減小之間的定量關(guān)系; 4 、加導(dǎo)流板可以減小丁壩后的回流尺度,并得出了丁壩周圍的水流fr數(shù)與回流尺度減小之間的定量關(guān)系。